Enterasys SecureStack A2 A2H124-48P Guía de instalación Pagina 32

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 82
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 31
Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to Installation
Wheninstallingtheswitch,notethefollowing:
•Beforestartingtheinstallation procedure,notifythenetworkadministratorofthe
installation.
•Followtheinstallationprocedures intheorderaspresentedinthisguide.
•DonotconnecttheswitchtothenetworkuntilyouhaveestablishedthecorrectIP
address.
Required Tools
APhillipsscrewdriverisrequiredtoinstalltheswitchintoarack.
Unpacking the Switch
Unpacktheswitchas follows:
1. Opentheboxandremovethepackingmaterialprotectingthesw itch.
2. VerifythatthecontentsofthecartoncontainstheitemslistedinTable 31.
3. Removethetapesealonthenonconductivebagtoremovetheswitch.
4. Performavisualinspectionoftheswitchforany
signsofphysicaldamage.Contact
Enterasys Networksifthereareanysignsofdamage.RefertoGettingHelpon
page 17fordetails.
Table 3-1 Contents of Switch Carton
Item Quantity
A2H124-24P or A2H124-48P switch 1
Mounting kit (two mounting brackets and eight M3x6-mm screws for rack mounting) 1
Rubber feet with adhesive backing for installation on a flat surface 4
AC power cord (The type of power cord is country dependent.) 1
This installation guide 1
Customer Release Notes 1
URL notice card 1
Vista de pagina 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 81 82

Comentarios a estos manuales

Sin comentarios