Enterasys Enterasys Gold Distributed Forwarding Engine 4G4282-49 Guía de instalación Pagina 88

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 90
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 87
Memory Locations and Replacement Procedures
B-8 Mode Switch Bank Settings and Optional Installations
Installing the DIMM on 4G4202-72 or 4G4282-49
ToinstallaDIMM,refertoFigure B8andproceedasfollows:
1. PushtheconnectorarmsawayfromtheDIMMenoughtoinserttheDIMMintothe
connectorcontacts.
2. InserttheDIMMstraightdownbetweentheconnectorcontactsenoughforthetabs
ontheconnectorarmstoalignwiththetwoDIMM
alignmentnotches.
3. PushtheDIMMdownintotheconnectorcontacts,thenrotatethetwoconnectorarms
towardtheDIMMtolock itintoplace.
Figure B-8 Installing the DIMM on 4G4202-72
or 4G4282-49
Caution: Observe all Electrostatic Discharge (ESD) precautions when handling sensitive
electronic equipment.
Precaución: Al trabajar con equipos electrónicos sensibles, tome todas las precauciones
de seguridad para evitar descargas de electricidad estática.
1 DIMM Connector arms 3 Connector contacts
2 DIMM 4 DIMM alignment notches (2)
Á
Â
Ã
À
Ã
À
Vista de pagina 87
1 2 ... 83 84 85 86 87 88 89 90

Comentarios a estos manuales

Sin comentarios