Enterasys SecureStack A2 A2H123-24 Guía de instalación Pagina 28

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 64
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 27
Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to Installation
Wheninstallingtheswitch,notethefollowing:
•Beforestartingtheinstallationprocedure, notifythenetworkadministratorofthe
installation.
•Followtheinstallationproceduresintheorderaspresentedinthisguide.
•DonotconnecttheswitchtothenetworkuntilyouhaveestablishedthecorrectIP
address.
Required Tools
APhillipsscrewdriverisrequiredtoinstalltheswitchintoarack.
Unpacking the Switch
Unpacktheswitchas follows:
1. Opentheboxandremovethepackingmaterialprotectingtheswitch.
2. Verifytha tthecontentsofthecartoncontainstheitemslistedinTable 31.
3. Removethetapesealonthenonconductivebagtoremovetheswitch.
4. Pe rformavisualinspectionoftheswitchforany
signsofphysicaldamage.Contact
Enterasys Networksifthereareanysignsofdamage.RefertoGettingHelpon
page xviiifordetails.
Table 3-1 Contents of Switch Carton
Item Quantity
A2H123-24 switch 1
Mounting kit (two mounting brackets and eight M3x6-mm screws for rack mounting) 1
Rubber feet with adhesive backing for installation on a flat surface 4
AC power cord (The type of power cord is country dependent.) 1
This installation guide 1
Customer Release Notes 1
Vista de pagina 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 63 64

Comentarios a estos manuales

Sin comentarios