Enterasys C2RPS-SYS Guía de instalación Pagina 30

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 78
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 29
Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to Installation
Wheninstallingtheswitch,notethefollowing:
•Beforestartingtheinstallationprocedure, notifythenetworkadministratorofthe
installation.
•Followtheinstallationproceduresintheorderaspresentedinthisguide.
•DonotconnecttheswitchtothenetworkuntilyouhaveestablishedthecorrectIP
address.
Required Tools
APhillipsscrewdriverisrequiredtoinstalltheswitchintoarack.
Unpacking the Switch
Unpacktheswitchasfollows:
1. Opentheboxandremovethepackingmaterialprotectingtheswitch.
2. VerifythatthecontentsofthecartoncontainstheitemslistedinTable 32.
3. Removethe tapeseal onthenonconductivebagtoremovetheswitch.
4. Performavisualinspectionoftheswitchforany
signsofphysicaldamage.Contact
Enterasys Networksifthereareanysignsofdamage.RefertoGettingHelpon
page xviiifordetails.
Table 3-2 Contents of Switch Carton
Item Quantity
C3G124-24 or C3G124-48 Switch 1
Mounting kit, consisting of two mounting brackets and eight M3x6-mm screws for
rack mounting
1
Rubber feet with adhesive backing for installation on a flat surface 4
AC power cord (The type of power cord is country dependent.) 1
This installation guide 1
Customer Release Notes 1
URL notice card 1
Vista de pagina 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 77 78

Comentarios a estos manuales

Sin comentarios